location
Manufacture address: 210002, Republic of Belarus, Vitebsk, M. Gorky str. 59, office 48a
vtsh-300 background

VTSh-300 screw conveyor

Built in-house. Made to suit the site.

|
-
VTSh-300 screw conveyor

About the VTSh-300 conveyor

A screw (helical) conveyor for moving manure: it collects the mass from the manure channels of a building and feeds it into a receiving pit or a sunken tank. The working element is a tube shaft with a continuous welded flight and a lead-in blade at the end; the structure is welded from steel and built at our own plant. Flight diameter is 300 mm; line length, discharge point and drive are calculated for the particular building. It runs in an open manure channel — including under the slatted floor of a working barn.

Where it sits in the technology chain

Every manure removal scheme starts with mechanical removal of the mass from the building every day — and that is the stage the conveyor covers. From there the mass follows the chain: receiving pit → VTN pump → storage, fields or separation into fractions. Both parts of that chain are built by NPO-Organika, so one team handles the selection, the installation and the service.

The conveyor and how it works

  • A batch of VTSh-300 screw conveyors at the plant
    A batch of assembled screws: a tube shaft with a continuous welded flight and a lead-in blade
  • An installed VTSh-300 screw conveyor line in a concrete channel
    An installed line: the screw laid along the bottom of an open concrete channel
  • A screw conveyor line running along a manure channel
    View along the channel: the line is assembled to match the particular building
  • Installing a screw conveyor in a working cattle barn
    Installation in a working barn: the screw above an open channel
  • 3D model: a screw conveyor feeding mass into a tank
    3D model: the conveyor feeds mass into a tank, with VTN pumps on portals alongside
  • 3D model: the screw enters the tank through a side hatch
    3D model: the screw enters the tank through a side hatch, with the drive visible

Photos 2–4 were taken on site; images 5 and 6 are 3D models.

The conveyor at work — videos from installations

First clip: the screw moving manure in a channel under the slatted floor of a barn; second: an installed line in an open concrete channel.

From the channel to the pit — without hand clearing

As long as there is no conveyor in the manure channel, the mass is cleared out of the building by hand — every day. The VTSh-300 screw conveyor, built in-house, takes it out of the channel and feeds it into the receiving pit, where a VTN pump picks it up. Channel → conveyor → pit → pumping → storage: the whole chain from one plant — one phone number both to order and to service it.

  • In production since 2007
  • More than 100 units installed on farms
  • Manufacturer's service in Vitebsk
  • Delivery across Belarus and Russia

Built to suit your farm

Where the conveyors have already worked

At the Mazolovogaz farm, screw conveyors worked as part of an upgrade package together with a VTN-1 pump — according to the magazine (No. 2/2022), the upgrade raised milk yields and liveweight gain by 12%. That is the effect of the whole package, not of a single item of equipment.

Designed in-house

The geometry and working principle of the conveyor were developed by the company's director — as reported by the industry magazine Nashe Selskoye Khozyaystvo: Veterinariya i Zhivotnovodstvo (No. 2/2022).

VTSh-300 technical specifications

Flight (helix) diameter, mm300
Materialsteel
Manufacturein-house production
Line length and driveto suit the site (selected when you order)
Priceon request

VTSh-300 screw conveyor — frequently asked questions

Where is the conveyor installed?

In an open manure channel of the building, including under a slatted floor; the screw is laid along the bottom of the channel to collect the mass and feed it into a receiving pit or a sunken tank. We will work out the layout for your barn (line length, discharge point) when you order.

What length and what throughput?

The conveyor is built to suit the site: line length and drive are calculated for your channel and your volume. Send us the building plan and the herd size — we will name the parameters and the price.

Does the screw work together with VTN pumps?

Yes, that is the standard scheme: the screw collects the mass from the channels into the pit, and a VTN pump moves it on to storage or to separation. Both items are built by NPO-Organika, with installation and service by one team.

Price on request: the configuration is assembled for your site. Leave a request and an engineer will select the right version and quote the price.